Illustrative example, project pending validation
Warehousing Year 2024
Hub logistique, Vridi
Commissioning of an 8,000 m² warehouse near the port, with dry and temperature-controlled zones.
Warehousing
High-bay racking, dock levellers, a WMS integrated with the group’s traceability system, an in-house-trained forklift team.